Infrastructure

Our company is known for its

highest ethical standards for maintaining transparency and integrity

M/s Srinivasa Reddy Constructions, a registered Special Class Contractor since 2005, is a dynamic, dedicated, and resourceful civil engineering company. With over 28 years of experience in delivering projects for Irrigation, R&B, and Panchayati raj and the public works department in the Public sector and Industrial projects in the private sector, our company has earned a strong reputation for its commitment to project planning, execution, and timely delivery.

Backed up with extensive knowledge, vast experience, state-of-the-art plant facilities, and well-equipped construction machinery, SRC will always operate at the highest levels of quality, safety, and timely delivery of projects.

Srikakulam

Vizianagaram

Visakhapatnam

East Godavari

West Godavari

Nellore

Plant Facility in Srikakulam and West Godavari:

  • Fully automatic drum mix type Asphalt Plant/ Hot mix plant having rated capacity 40/60 TPH of 4-bin feeder, Electronic belt weighing system, Multi line dry dust collector, mineral storage hopper, with centralized insulated control cabin.
  • Automatic Batch Mix plant (Schwing Shutter company) having a capacity of 60 m³/hour with 2 nos. of silos, each with a 100 MT capacity.
  • Wet Mix Plant with 100 MT/hour capacity
  • Mini Hot plant with a capacity of cyclos,8-10 TPH

Our Construction Machinery :

  • Schwing Transit Mixers
  • Greaves concrete pumps
  • Asphalt paver Finishers
  • Wet Mix Paver Finisher
  • Excavators/Poclains
  • Tippers
  • Vibratory Soil Compactors
  • Smooth Wheeled vibratory rollers
  • Front end loaders (JCB)
  • Bulldozers
  • Concrete Mixers
  • Power Road Rollers
  • 12-ton capacity mobile cranes
  • Tractors
  • Automatic Vehicle-mounted Bitumen/Emulsion mobile Sprayers
  • Water Tankers with sprinklers
  • Air Compressors
  • Diesel Generators

Shuttering Capacity Include:

  • 100,000 sq. m of steel and plywood shuttering
  • 5,000 nos. of props (junior and senior)
  • 2,500 nos. of M.S. Cuplock system scaffolding with required bracing pipes 3 m length